We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Buffalo, NY foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Buffalo, NY job.
Most crack injection appointments can be scheduled within a day or two of your call.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

Every Buffalo, NY Foundation Crack Repair job starts with an inspection, not a generic package — here's what that typically includes.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Cracks that are still weeping get flexible polyurethane, which expands into voids and stays flexible enough to handle minor seasonal movement.
We also check for bowing alongside stair-step cracks, since that combination can point to a bigger structural issue.
We document crack width and location with photos before and after injection so you have a record of the repair.
Selling a Buffalo, NY home with a flagged foundation crack? We can inspect, repair, and provide documentation for the buyer's lender or inspector.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
We also check the exterior grading near the crack, since poor drainage is often what caused it in the first place.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"Crack in our basement wall had been leaking for a year before we finally called. Injection took less than an afternoon and it's been dry since."
— Buffalo Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Buffalo Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Buffalo Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Buffalo Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Turnaround is usually fast enough to fit within a typical closing timeline.
We handle foundation crack injection throughout Buffalo and the surrounding Buffalo, NY service area, including the zip codes listed below.



Zip codes we serve in Buffalo, NY: 14208 14209 14202 14203 14201 14206 14207 14204 14220 14222 14211 14210 14213 14212 14215 14214 14216 14205 14233 14240 14263 14264 14267 14269 14270 14272 14273 14276 14280 14217 14218 14219 14221 14223 14224 14225 14226 14227 14228 14260 14261
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.